Underground Facilities for Residential Buildings

 of Up To Two Units

 

Main

Table of Contents

Back

  1. In areas where TELUS Communications Company provisions with buried cable, TELUS Communications Company is responsible for providing and installing the network wiring to the property, and the owner/developer is responsible for a suitable trench and/or conduit as stipulated by TELUS Communications Company from the property line to the building service provider demarcation location.

    Note:

    A suitable trench shall be a minimum of 450mm deep (600mm preferred, 900mm for area subject to vehicular traffic or 600mm with mechanical protection) and a width capable of accommodating the wire or cable placement.  If conduit is required, the size and type will be stipulated by TELUS Communications Company and shall be placed a minimum of 450mm deep.  The trench and/or conduit shall be provided between the building and property line as specified by TELUS Communications Company  (See C.E.C Sec. 60-600).

  2. In areas provisioned by aerial cable, TELUS Communications Company will provide buried service, if requested, upon the owner/developer providing a suitable trench and/or conduit as required.  TELUS Communications Company reserves the right to levy any additional charges deemed necessary for the provision of this service.

  3. Where communication and power service conductors are to be buried in a common trench, the conductors shall be separated by 300mm of well tamped earth or sand, or 75mm of concrete, or placed in conduit - (Orange PVC DBII).  The exception to the rule is when concentric neutral power cables are used, where random separation is acceptable.  TELUS Communications Company shall be notified a minimum of 48 hours before backfilling  

  4. TELUS Communications Company shall provide network service wire or cable for direct buried services to an outside location 

  5. Network service conduit shall extend down the outside wall into the excavation a minimum of 300mm below final grade and extend up the outside wall to a point 1.3m above finished grade.  Conduits shall not be bent along the bottom of the trench.  (Refer to Fig. 1).  Network service conduit shall terminate in a "T"-Bend (T.B.) access fittings as indicated in Figure 1, "L"-Bend (L.B.) or in an approved enclosure.

  6. The telephone service pathway should be as close as possible to the power service facilities up to the TELUS protector location.  A 25mm conduit is to be provided by the owner/developer from the protected terminal to the demarcation point (inside house) complete with a No. 6 green insulated ground wire connected to the power service ground.  See Section 3 Grounding Requirements.

Figure 1.
Service Entrance For Buried Service

Notes:

  1. A No. 6 green insulated ground wire to be placed from power ground by owner/developer to TELUS NIB.  Two separate 4-pair CAT5e set runs should be placed between this common location and the NIB located outside the home.  The inside wiring should be done in a "star configuration" where the individual set runs from each telephone jack and TV location collect at a common location.

  2. The inside wiring should be done in a "star configuration" where the individual set runs from each telephone jack and TV location collect at a common location within the home.  Two CAT5e set runs are to be placed between the star configuration location and the NIB on the outside of the home.

  3. A 3 m length of  'working slack' TELUS entrance wire must extend from the end of the 25 mm conduit and a 1 m length of 'working slack' for the No. 6 green insulated ground wire and 4-pair CAT5e inside wire if not placed by TELUS.   DO NOT CUT TELUS ENTRANCE DROP WIRE.

  4. This space is required for the TELUS supplied Network Interface Box (NIB).

 